Metro News

Flash floods: Lagos assures residents safety, effective management

The Lagos State Government, on Tuesday, allayed fears of residents on the continuous heavy downpour being experienced in the past few days, assuring that necessary measures are in place to effectively manage the flash floods resulting from the rain.

The Commissioner for the Environment and Water Resources, Mr. Tunji Bello, gave the assurance at a Press Briefing in Alausa, while outlining measures already put in place for this year’s rainfall pattern, stating that additional heavy rains should be expected in July & September.

name changing

He urged all residents of low lying areas like Agboyi-Ketu, Ajegunle and several others to relocate from their residences, without further delay, to avoid being trapped by the rainfall at the risk of their lives and property.

The Commissioner also advised residents living along the plains of Ogun River to be on the alert and take necessary precautions as the Ogun Osun River Basin Authority, which manages the Oyan River Dam will soon commence the seasonal water releases, stressing that the controlled water discharge has become expedient as a result of weather forecasts and the continuous heavy downpour.

In his words: “In July, five million Cubic Meters (MCM) will be released while by August, they will release eight to 10 million cubic metres. In September, it will be increased to 18 million cubic metres while in Oct, 23 million cubic metres will be released which is the peak.

Then by November gradual reduction of water release to the tube will be 11million cubic metres”.

Bello added that from the prediction of the Nigeria Meteorological Services, NIMET, released early in the year, the increasing frequency of extreme weather events indicated that the year 2020 will likely experience days with extremely high rainfall which may result in flooding.

He stated that the high volume of rainfall being experienced in June will run into July and September, urging Lagosians not to entertain fear because the State Government has mapped out strategies to contain flooding that may be experienced as a result of heavy rainfall.

“The State Government is presently working on 222 secondary channels out of which 146 have been completed across the State, just as 46 primary Channels are presently receiving attention, in addition to the efforts of the Emergency Flood Abatement Gangs (EFAG).

“The State Government is presently working on 222 secondary channels out of which 146 have been completed across the State, just as 46 primary Channels are presently receiving attention, in addition to the efforts of the Emergency Flood Abatement Gangs (EFAG) that contractors are already working on all the channels in the area, stating that cleaning usually starts from the lower stream to the upper stream and that the same applies in Aguda, where dredging is moving gradually towards all the areas adjoining LUTH Idi-Araba and Ishaga which are all parts of System 6c”.

Also speaking at the press briefing, the Special Adviser on Drainage and Water Resources, Engr. Joe Igbokwe said the issue of flooding was not only peculiar to Nigeria because other countries of the world also experience flooding during the rainy season.

He decried the situation where residents erect shanties on drainage setbacks, dump refuse indiscriminately, block drainage channels and constitute a nuisance to the neighbourhood, stressing that the government would embark on strict enforcement of the environmental laws against perpetrators.

Igbokwe urged Lagosians to embrace the waste to wealth initiative of the State where plastic bottles and Styrofoam can be sorted in exchange for a stipend, adding that in coming days, a commercially viable option would be found for Styrofoams.

The Bliss
Your No 1 Shop for relevant and updated news
https://www.thebliss.com.ng